Steel Ladder Test To:BS EN131-2:2010 Report Reference No: TCJS1202200887 Industrial ladder, tested to BS EN131-2, 2010.Square, non slip rungs, angled to produce flat surface in position of useOrange epoxy coating for high visibility rust protectionOversize rubber feet at top and bottom allow use either way up EN131 Scaffolding Epoxy 4M Steel Ladder
... : Direct Acting, Normally Closed Air, Water, Oil 2 port 2 position Model2W025-062W025-082W040-102W160-102W160-152W200-202W250-252W350-352W400-402W500 ...
... couplings. Optimum accuracy and performance at all times, in any position; Revolutionary grooved piston for improved, durability and performance; Durable tamperproof ...
... motor should be completely submerged in water,it is highest position should be below the moving water level,it is lowest ... position to well bottom should be no less than 5 meters. ...
... operation. Through adjusting the bearing components to change the impeller position in the pump chamber all-time high-efficient operation of ... bearing components in the pump impeller to suit the cavity position of the pump. The pumps are designed with rear-assemblage ...
Battery Selector Switch 1.battery switch 2.2 position 3.isolator switch SEAFLO Battery Selector Switch SFBIS1-01 Selector ... Switch 1.battery switch 2.2 position 3.isolator switch May be connected to either the positive ... , Anti-ultraviolet.Two positions: “on” and “off”. In the “off” position the key may be removed. ModelMax.Volt(V)Amp Draw ...
Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.