Welcome to ECOL - Join Free - Sign In
frequency conversion series-wound Resonant Testing System
frequency conversion series-wound Resonant Testing System
Supplier Info
[China Supplier]
Contact Person : Ms. Liu Abby
Tel : 86-29-82258667,82258674,82258672
Fax : 86-29-82242382
Product Detail
The system is easy to assemble for partial discharge measurement and voltage withstand test

1- Main Applications:

The system is easy to assemble for partial discharge measurement and voltage withstand test for GIS and XLPE cables under voltage grade of 252kV.

2. Operating Conditions:

    - Altitude: <1000m

- Ambient Temperature: -25°C +50°C

- Max. Daily Temp. Difference: 25°C

- Relative Humidity: ≤95%(20°C)

- Max. Wind Speed: 25m/s

- Without conductive dust at site

- Without fire and blasting risks at site

- Without rusting metals and insulated gas at site

- Waveform of power supply voltage is sine actual; and it's aberration ratio is <5%

- Set a reliable earthing point at site

- Installation: Indoor

3- Main Equipment List

    List of Main Equipment for the First Phase:

1. Filter of Power Supply

LSF-200/3*240 Three Phase Filter                                01 pc

(The selected capacity is enable to cover the requirement after the system upgrade)

LDF-200/2*500 Single Phase Filter                               01 pc

(The selected capacity is enable to cover the requirement after the system upgrade)

2,HVF-200 Frequency Conversion Source                          01 pc

(The selected capacity is enable to cover the requirement after the system upgrade)

3.YDK-2350/2*235 HV Reactor                                   02 pcs

(The first phase construction will obtain 470kV high voltage output through the connection in serise of 2 reactors of 235kV each, and its current can be go up to 5A; and with the parallel connection current of 10A. The margin for the second phase construction is kept in this design, that the upgrade can be obtained 705kV / 5A, and with the parallel connection current of 30A.)

4.TRF705-0.001 Capacitive Divider                                  01 pc

(The first phase construction will meet the capacity of 2 reactors of 235kV each, and the the connection in serise to 470kV. The margin for second phase construction for the upgrade to 705kV is kept.)

5.GL705-5-0.04 HV Current-limiting Reactor                           01 pc

(The equipment is enable to cover the requirement after the system upgrade)

6.YDW-200/2*20 Excitor                                           01 pc

(The selected capacity is enable to cover the requirement after the system upgrade)

frequency conversion series-wound Resonant Testing System

Ads by Google

Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.