Welcome to ECOL - Join Free - Sign In
whole set household biogas system family biogas equipments with PVC soft digester
whole set household biogas system family biogas equipments with PVC soft digester
Supplier Info
[China Supplier]
Contact Person : Mr. Tang Siyo
Tel : 86-27-83315893,13277936540
Fax : 86-27-83315893
Product Detail
Weather resistant Easy to move and maintain. High safety. Economical and durable. Horizontal and vertical ways to store air

Looking for a Qualified biogas project supplier?

 

WE CAN PROVIDE

·Specific Project Plan

We can provide detailed biogas project plan dealing with your particular temperature, raw materail, ideal output and your special requirements etc.

·Whole set biogas equipment

We provide every neccessary parts  even including every single pipe and screw.

·Installing or training.

For large scale project. after recieving your goods  we will bring our engineer to your local address for installing. For easy installed house sized project, we can provide the detailed pictures

videos and instructions of installing.

·After sell services

After the order is done, we can provide technical parameters of the raw matching princinple, maintenance of equipments and etc.

 

1.  The daily dung-dirt through the Dung-dirt introductory manger flows into the Preparatory acidification pond that can get rid of the large grained  suspended substance, while adjust the volume& quality ,PH value, temperature of the dirty water, as well as to aeration previously which can transpire some poisonous substance by atmosphere transpiration , as to reduce volumetric organic loading rate.

2.  The processed dung-dirt will enter into the Soft horizontal anaerobic reactor to anaerobic ferment. This project designed HRT namely that the time of the dung-dirt stay in the reactor is 20 days.

3.  The Biogas dregs-liquid after anaerobic fermenting enter into the Biogas dregs-liquid pond, meanwhile fractional biogas liquid return to Preparatory acidification pond to periodic duty. The remnant biogas dregs-liquid processed by the biogas dregs-liquid pond’s aerobic action are used for farmland.

4.  Biogas protector is used to relieve pressure of the biogas reactor bearing when the biogas  production  is more,as well as to prevent backfire.

5.  The biogas will get rid of the in-water by the dehydration device, and then enter into the desulphurization device to wipe off the poisonous gas---H2S in biogas. At last, it enters into the biogas storage; The biogas storage is mainly used for hold biogas to keep continuously and smoothly using.

6.  The biogas voltage increased by the pump is used for various depletion systems such as :Biogas rice cooker\ Biogas cooker\ Biogas water heater\Biogas light etc.

 

 

Looking for a qualified biogas project supplier?

 

ACME is a experienced biogas project supplier, we specialized in this field for many years with high reputation.

-ACME  supplies whole biogas plan according to your different budget.

-ACME offers the whole set of equipments and installing and after service.

-ACME provides both big biogas project equipments and family size biogas system.

-No matter you are a big investor or a small dealer, please come to ACME, we will offer the most suitable biogas program.

 

Related Products
Ads by Google

Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.