Welcome to ECOL - Join Free - Sign In
2013 hot selling environmental friendly oil recycling
2013 hot selling environmental friendly oil recycling
Supplier Info
[China Supplier]
Contact Person : Mr. Black Alan
Tel : 0086-0371-55917087
Fax : 0086-0371-55917067
Product Detail
1.ISO&CE&China Green Star 2.environment protection and no pollution 3.own nine national patent 4.oil yield rate 80%

Technical Parameter of Xinxiang Huayin Waste Engine Oil Purifier Machinery

No.

Items

contents

1

Model

HY-3

HY-5

HY-10

2

Raw Material

crude oil/waste motor oil/waste engine oil

crude oil/waste motor oil/waste engine oil

crude oil/waste motor oil/waste engine oil

3

Size of Reactor

1500mm*3000mm

2000mm*5000mm

2600mm*6000mm

4

Material of

Reactor

Q345R boiler plate

Q345R boiler plate

Q345R boiler plate

5

Thickness of

Reactor

16mm

16mm

16mm

6

24-hour

Capacity

3 tons

5tons

10 tons

7

Operating

Pressure

Normal

Normal

Normal

8

Cooling Area of

Condenser

67.231sqm

67.231sqm

67.231sqm

9

Mode of

Cooling

Water Cooling

Water Cooling

Water Cooling

10

Working Form

Intermittent Operation

Intermittent Operation 

Intermittent Operation

11

Noise (db)

≤75

≤75

≤75

Advantages

1.Safety valve, auto-alarm, anti-back fire device, Q345R boiler plate, good welding

etc. They all guarantee working safety and service life of our equipments.

2.In significant measure, specialized catalyst which improves oil out-put yield and the

quality of oil.

3.Dust removal system guarantees that there is no air pollution. Sealed slagging

makes sure that there is no solid pollution. Waster-cycling system ensures cooling

effect and that there is no water pollution. So our equipments are environmental

friendly.

4.Tail gas recycles to furnace burning as fuel. So it saves energy and is more

environmental friendly.

5.Reliable after service guarantees warranty, installation of machine and workers'

                  training. We sincerely wish a long-term cooperation and a happy relationship with

                  customers.

After service

                

                1. Installation and Training : Our company will send one technician for each set of

                  machine for guiding your installation, testing the machine and training your           workers.

                  The installation period shall be 30 days.

                2. Warranty : The warranty period is 1 year. The problem caused by wrong operation

                  of workers shall not be responsible for our company.

Our working factory to make the reactors:

our running plants in our demo factory:

our machines are loaded in our factory:

our machines are at QingDao Port.

Ads by Google

Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.