Welcome to ECOL - Join Free - Sign In
2012 best sold in India no pollution used plastic pyrolysis machinery
2012 best sold in India no pollution used plastic pyrolysis machinery
Supplier Info
Product Detail
1. Process simple&practical 2. Direct heating 3. big heating area 4. No pollution, water steam only 5. Auto-welding, X-ray

The tyre & plastic pyrolysis machine details

About our company

We are specialized in manufacturing waste tire, plastic & rubber pyrolysis machine & distillation oil equipment, incidental tyre cut machine, carbon black refining machine and Carbon black granulator machine according to the market and customer requirements. With advanced production technology, high quality product, excellent sales and good after service our products are sold both in domestic and international market.

1) The model and capacity:

Reactor size

weight

volume

capacity

Note

1

2200*6000mm

27MT

23 M³

5 MT

3 batches 2days

2

2200*6600mm

29MT

25 M³

6 MT

3 batches 2days

3

2600*6000mm

32MT

32 M³

8 MT

1 batch 1 day

4

2600*6600mm

34MT

35 M³

9 MT

1 batch 1 day

5

2800*6000mm

35MT

37 M³

10 MT

1 batch 1 day

6

2800*6600mm

38MT

41 M³

12 MT

1 batch 1 day

2) Fuel

The fuel can be fuel oil, heavy oil, coal& firewood.

3) The processing time:

Model

Feeding

Processing

Cooling

Discharge

total

2200*6000

2hr

7-8hr

2hr

2hr

14hr

2200*6600

2hr

8hr

2hr

2hr

14hr

2600*6000

3 hr

10 hr

3 hr

3 hr

19 hr

2600*6600

3 hr

11 hr

3 hr

3 hr

20 hr

2800*6000

3 hr

12 hr

3 hr

3 hr

21 hr

2800*6600

3 hr

13-14 hr

3 hr

3 hr

23 hr

4) End product percentage (the raw material is tyre)

Fuel oil

Carbon black

Steel wire

Waste gas

45%

35%

10-12%

8%-10%

5) Machine motor Power

model

Draft fan

speed reducer

water pump

oil pump

4blowers

2200*6000

4kw

3kw

1.5kw

1.5kw

1kw

2200*6600

2600*6000

7.5kw

5.5kw

2600*6600

2800*6000

2800*6600

6) Packing Containers:

2200*6000

two 40HQ containers

2200*6600

2600*6000

one 40FR open container and one 40HQ container

2600*6600

2800*6000

2800*6600

7) The machine installation

We will give the foundation drawings to buyer after make the order .we will send engineer when buyer gets the machine. The engineer mainly installs the machine and trains your workers.

8) The machine covers area:

The machine itself cover 300 square meters (length 20M, Width 15M)

Add raw material stay, carbon black stay, big oil tank zone, workers rest room and simple office. It takes at least 600-800 square meters.

9) Workers need to operate machine:

Four workers are enough for one set machine.

10) Delivery time:

We will delivery the machine within 15-20days after get the advance payment (30% of the total amount).

11) Port (China):

Lianyungang port or Qingdao port

12) Working process:

Firstly, two or three workers put the raw material into the furnace, seal the feed inlet, and then burn the coal /wood in the bottom of the furnace, or it can be heated by electricity directly. The waste raw material in the reactor will be heated slowly. The oil steam will be produced when the temperature reach 180°C-400°C. And then the oil steam will be separate to light component and heavy component by separate device. The light component will enter into the condenser and meanwhile the residues will be discharged automatically in succession. After cooling, the liquefied part will be crude oil, and the waste gas (this part can not be liquefied) will return to heating supply system to be burned by combustion gas purification system.

13) The end tire product and usage

Tyre oil is also called fuel oil, and can be sold directly. (They are also used for deep processing or used for boiler fuel, bath center, restaurant, burn floor brisk and so on ) or use refining equipment to further processing.

14) Warranty and machine life:

We guarantee the complete machine two years, the reactor life more than 4 years, others parts no need change lifelong expect the wearing parts.

15)The analysis of economic benefit

16)The warranty and after-service:

1) We will supply the foundation drawings to buyer after get deposit.

2) The delivery time is 15-20 days after get deposit.

3) We will send engineers to install the machine when the machine reach buyer's factory.

4) We warranty the complete machine two years, we will maintenance all it life. When the machine can not running normal, the buyer can call us, we will help buyer repair it by call, if can not solve, we will send engineer to buyer's factory at the shortest time. If buyers need change parts, you can buy it from our factory.

Related Products
Ads by Google

Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.