Welcome to ECOL - Join Free - Sign In
Railway locomotive running gear side frame
Railway locomotive running gear side frame
Supplier Info
[China Supplier]
Contact Person : Ms. Li Linda
Tel : 86-379-64977797
Fax : 86-379-65169888
Product Detail
1.German V-type modeling tech. 2.Russian certification 3.Ukrainian certification 4.overall core B+ Class Steel 5.best seller       Our Certifications and Features are:

1.Got the American "AAR" Certification;

2.Got the Russian Certification;

3.Got the Ukrainen Certification;

4.Using the German "V" modeling technology;

 

Side frame - one of the main structural elements of the bogie framework of the model 18-100. It is manufactured by casting, with additional machining and riveting of wear-resistant plates. Side frame, drawing No.100.00.002-4SB, represents a major piece of a freight wagon bogie, which transmits the load on the axle through the axle box. Cast alloy steels 20GFL and 20GL.

 

Bolster drawing No.100.00.001-6 serves as a bridge between the two side frames in the construction of a freight wagon bogie.To ensure reliability and durability the bolster is casted from steel 20GFL or 20GL.One of the main frame details of a bogies framework model No.18-100. Set lifetime of a bogie frame before a bolster discarding is 30 years. The designated lifetime up to the first depot repair is 2 years, before the first overhaul is 8 years. Established time to failure is at least 2 years. 

 

Overall dimension:

 

side frame:2.41m*680cm*56cm weight:400kg 

 

bolster:2.61m*39.5cm*47cm weight:525kg 

 

 

 

Ads by Google

Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.