Welcome to ECOL - Join Free - Sign In
2013 new hot extrusion blow molding machine
2013 new hot extrusion blow molding machine
Supplier Info
[China Supplier]
Contact Person : Mr. chen binliang
Tel : 86-512-58530838
Fax : 86-512-58961095
Product Detail
1, the fully automatic production 2, high output 3, energy saving 4, the CE certification

2013 extrusion blow molding machine

Is indebted selects and purchases the plastic which Zhangjiagang the dragon China machinery Limited company produces to squeeze out the blow molding midheaven shaper, sincerely in this acknowledgment!The Zhangjiagang dragon China machinery Limited company is the plastic squeezes out the blow molding midheaven shaper specialized Manufacturer.

Before operation use, please careful reading this instruction for use, with the aim of using correctly. Please preserve this instruction booklet well prepares the reference.

I.        Head of mould

Whole structure: convenient

Heating way: loop made in STS

arrangement of temp. control:±1°C

heating power: 4kw

heating zones: 3

mould material: treated with N, P, Cr

temp. control: TAIWAN YANHUA PID

core and convention of mould: a set with machine, if adding it should be paid more.

I.        Close structure

Type: double axes, single oil jar, double way, synchronization, opening and closing speed is fast, but smoothly.

Power of pressing the mould: 30KN

Leakage in two side of mould: 120-250mm

Mould thickness arrangement: 110-115mm

Max size of mould(L*H): 260*300mm

      Other itemsseller will train 1-2 workers to operate and repair the equipment for free. It does in seller’s factory.seller must setup and test the equipment until it can produce normally and help to train the workers in the demander’s factory for free. if the is something wrong in the proceeding, the seller must ask someone to serve for demander after receiving the repair information. But excepting the impersonal reasons.if because the demander uses the Hollow Blow Extruding Machine for the first time, the seller will be sure to send a engineer to demander’s factory and affording technical service in one month.  Available quotation date

This quotation is available in 30 days. If the price or technical parameter changed after the term, we will not inform you again.

This quotation only offers the demander choice to select machine. It can be look as a contract. Both sides must observe the contract.

The details of technical parameter is written in following tables. If there is any questions please ask us as pleasure.

Ads by Google

Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.