Welcome to ECOL - Join Free - Sign In
automatic high speed 2200mm fourdrinier kraft paper machine
automatic high speed 2200mm fourdrinier kraft paper machine
Supplier Info
[China Supplier]
Contact Person : Ms. wang sandy
Tel : 86-0391-5671998
Fax : 86-0391-5671998
Product Detail
1. high quality 2. high strength 3. high speed 4. easy to operate

A. Process flows:

The process flows: waste paper → high concentration aquapulper → high frequency vibrating screen → pulp pump → efficient double disc pulp grinder → pulp pump → spiral propeller → pulp pump → centrifugal screen → pulp pump → slag remover → 2200 model paper machine → calendar → winding machine → rewinding machine → marketing

B. Main machine list

Product name

model

quantity

motor(kw)

high concentration aquapulper

5m³

2 sets

30

high frequency vibrating screen

2m2

2 sets

3

efficient double disc pulp grinder

380 model

3 sets

37

Pulp pump

4-8 inch

12 sets

18.5kw one, 5.5kw eight, 7.5kw two, 11kw one

Slag separator

606 model

6 groups

 

centrifugal screen

1.6m2

1 sets

37

propeller

700 model

4 sets

11

vacuum pump

15 model

2 sets

15

2200 model double-cylinder mould, one big dryer and five-small dryer carton paper machine

2200 model

1 set

75kw, 1.5kw

calender

2200 model

1 set

15

Reeling machine

2200 model

1 set

5.5

Rewinding machine

2200 model

1 set

7.5

Technical requirements

1.production varieties: test liner paper ect.

2.maxi-width: 2200mm 

3.grammage: 100-190g/m2

4.rail distance: 2200mm

5.output: 30t/d

6.working speed: 45-120m/min

7.kind of drive: AC frequency, sectional drive

8.machine design: heavy square box type

C. Remark:

The equipment includes all of the land rails, electrical machines, electrical equipments, back wheels, cardan joint couplings, pulleys, belts, screws, sizing blocks, dowels, bearings, base rings, carpets and wires.

We will send 2 engineers to be responsible for installation commissioning and training workers. You need to pay them $50 per day for each person and provide them food, hotel, air tickets and transportation. The installation period will be 90 days.

The delivery time will be 60 days after deposit in advance.

Ads by Google

Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.