Welcome to ECOL - Join Free - Sign In
construction formwork steel scaffolding for concrete slab
construction formwork steel scaffolding for concrete slab
Supplier Info
[China Supplier]
Contact Person : Ms. Fan Fancy
Tel : 86-186-31957368
Fax : 86-335-2889966
Product Detail
1 scaffolding for slab 2 instead of Doka system 3 steel beam instead of H20 beam 4 can be adjustable 5 no coupler / fastener

1 construction formwork steel scaffolding for concrete slab

No need Coupler / Fasteners very quick, save money save time

Main beam can be adjustable to get different length, fit the request of different room sizes / steel can be reused 200 times

 

   

 

The combination of our construction formwork steel scaffolding for concrete slab

: main beam / sub beam / vertical props/ horizontal props and u head jack

specification and price:

 

Name of commodity

Length (m)

Unit weight   (KG / PCS)

Main beam

2.68-4.39

20.8

2.28-3.68

17.6

1.27-2.88

13.55

1.17-1.78

8.8

Sub Beam

1.15

3.25

0.8

2.35

0.4

1.25

Vertical Props

2.55 with 2 plates

9.5

1.95 with 1 plate

7.6

1.35 with 1 plate

5.5

1.05 with 1 plate

4.4

0.75 with 1 plate

3.4

Horizontal props

1.22

3.9

0.87

2.80

0.47

1.6

U head jack

700

2.54

Advantage

1 scaffolding for slab2 instead of Doka system3 steel beam instead of H20 beam4 can be adjustable5 no coupler / fastener

Ads by Google

Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.