Welcome to ECOL - Join Free - Sign In
300KW biomass gasification power generation
300KW biomass gasification power generation
Supplier Info
[China Supplier]
Contact Person : Mr. su steven
Tel : 86-370-2215838
Fax : 86-370-2311466
Product Detail
biomass gasification power plant: 1. suit to wood chips, coconut shell, ect 2. application for many industry 3. save energy Specifications

The company gasifies the raw materials such as rice hull, fruit hull, saw dust, palm hull, wheat straw, cotton straw, corn straw

vedio of the power plant

http://v.youku.com/v_show/id_XMzIxNTY2NDg4.html

Introduction to biomass internal-combustion power generation systemModels & specifications:400KW,800KW,1MW,1.5MW,2MW,etcApplicable raw matrrials:All the plants and organic wastes                         The grain size of raw materials is less than 30mm in general.                         The water content of the raw materials is lower than 16% in general.Nature of fuel gas:scope of calorific #118alue 6000 kilojoule/m3(standard)                         Tar content 50mg./m3(standard)                         Compositions N2 50-60%                         Co2 10-20%                         CO  10-18%                         H2   3-9%                         Ch   2-6%                         CnHm  0.5-3%                         Other 0.5-3%Operation data:          Auxiliary fuel:Not necessary          Start time:About 45 minutes for cold start          About 15 miutes for hot start          Operator:According to the project scale:1-2 persons for each shift          Raw material consumption:1.0-2.0kg raw materials for generation of each kilowatt-hour          Power generation cost:Will be influenced by many factors. In most regions of china,the cost for generation of each kilowatt-hour is about RMB0.2 yaun.Environment protection standara:            Exhaust gas:The tail gas of gas engine shall reach the local industrial standard after treatment            Waste water:The cooling water shall be trated internally for recycled use,and no waste water will be dis-charged.            Waste residue:The solid wastes sahll be treated or reused through harmlessness treatment .No waste residue will be discharged.            Noise:The region with noise>75 db will be reused to decrease noise influence.            Smell:The space with smell will be sealed off with negative pressure,and the smell will not outflow

300KW biomass gasification power generation

Ads by Google

Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.