Welcome to ECOL - Join Free - Sign In
pelton water turbine
pelton water turbine
Supplier Info
[China Supplier]
Contact Person : Mr. chen yanyu
Tel : 86-10-68455929
Fax : 86-10-68411453
Product Detail
BIC can design , produce and install the small hydropower plant .It has super quality and low cost with excellent service.

Project Overview:

SHP is the short form for small hydropower plant. It makes use of hydraulic power driving of 

hydraulic machinery rotation, turns hydroenergy to mechanical energy, and generates electricity 

by transforming mechanical energy to electrical energy through the generator. Installed capacity 

of small hydropower plant in the world varies due to national circumstances. The capacity of SHP 

installed in United States is 15000kW and below, Japan, Norway is 10000kW and below, Turkey 

5000kW and below. In China, the current definition of SHP means power plant with a performance 

of 25000kW and below  and assorted local power supply grid.

Technology:

Small hydropower equipments mainly include turbine, generator, governor, excitation system, 

electronic control equipment etc.

Turbine: two ranges for below 500kW and 500 ~ 10000kW , the main models are reaction turbine 

(divided into axial-flow turbine , Francis turbine and tubular turbine) and impulse turbine (divided into pelton turbine, 

oblique Direct hit turbine and cross-flow turbine). Total Runner Series 21 , Unit 85 varieties.

Type and Model of Generator is a synchronous generator: rated power of 50Hz, power factor of 0.8.

Governor series XT-300, XT-600, XT-1000, for the pressure tank and electronic hydraulic.

Multi-excitation system for the semiconductor excitation devices, brushless excitation device.

Electronic control devices typically include control equipment for power station, switchgears for power

sub-station and power distribution device.

Our advantages:

1,Our state-owned company subordinated to IWHR, provided with strong technical strength, professional and 

fully equipped and high-quality technical personnel;

2,Years of experience in foreign water resources and hydropower projects, capable of undertaking

 turnkey projects (EPC), including feasibility studies, site selection, investigation, design, construction, 

equipment procurement and installation, commissioning and training.

3,Responsible for all import and export business of IWHR, strong foreign business ability and skills, 

strong anti-risk ability;

4,Full qualification for international hydropower project, high reputation.

Please give us your folowing data when make order:

1. Water head: Maximum head, minimum head, design head;

2. Water flow: Full flow of the power station, design flow of the unit;

3. Capacity of the power station: Capacity of each unit, unit qty;

4. Elevation: Horizontal centerline of turbine and tailrace;

5. Temperature condition: Maximum temperature over any year;

6. Length and diameter of penstock;

7. Condition of water quality: Such as sand content etc.

8. Operating manner of your station;

9. Techinical specification of generator: rated capacity, tated voltage, rated power submultiple, 

class of insulation, ventilative method, etc.

Ads by Google

Hot Products: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | 0-9
Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.